Power and site support planner

Generator kVA estimator

Build a generator hire conversation around watts, startup surge, run time, fuel, outdoor safety and sensitive electronics.

Portable generator and plug load planning setup
OutputKit class · consumables · checks · stop conditions · handoff summary

Answer the job questions

Build the pre-hire card

Use the selectors to create a plain-language hire conversation starter. It updates on the page and avoids hidden result URLs.

Guidance-only. Confirm the exact item, method, PPE and safety requirements before work starts.

Boundary

What this planner will and will not do

Merged guide

Generator kVA for small site use: a plain-English check

Estimate generator hire size by adding watts, startup surge and safe outdoor placement requirements.

Quick answer

Generator choice starts with what runs at the same time. Motors, pumps and power tools may need extra startup allowance; heaters and kettles can be far larger loads than expected.

Checks before hire

Starting current, motor loads and 110V site transformers

Running watts alone can understate a motor-driven load. Pumps, compressors and some power tools can draw a much higher current while starting, so use the equipment nameplate and ask the supplier to confirm the starting allowance rather than applying one generic multiplier.

What to tell the hire desk

Describe the job, material, scale, access and what would make you stop. That gives the supplier a better route to the right machine, consumables and PPE than asking for a tool name alone.

Stop condition: Stop if anyone plans indoor use, medical/critical equipment, unknown wattage, or high-surge loads without supplier advice.